Strip seal joints
Two steel edge profiles anchored in the edge beams, linked by a watertight elastomer seal. Suited to small and medium movements.
EXPERTISE / EXPANSION JOINTS
BBTP replaces worn expansion joints on bridges and viaducts: removal of the old joints, rebuilding of the reinforced-concrete anchorage zones and installation of new joints, for safe traffic and a structure protected from water.
HOW IT WORKS
The expansion joint keeps the running surface continuous across the deck gaps, between two spans or between the deck and the abutment, while allowing the movements caused by temperature, shrinkage, creep and traffic loads.
Directly exposed to traffic impacts, it is one of the most heavily loaded parts of the structure. Once damaged, it becomes noisy and dangerous, and lets water run onto the supports, damaging bearings, plinths and pier caps.
DIAGNOSIS
These signs are noted during bridge inspections or reported by road users. Replacing a joint in time avoids far heavier repairs to the supports and the deck.
EXPANSION JOINTS
The choice of joint depends mainly on its movement capacity, that is the range of movements to accommodate, and on traffic.
Two steel edge profiles anchored in the edge beams, linked by a watertight elastomer seal. Suited to small and medium movements.
Toothed steel plates, cantilevered or supported, anchored on either side of the gap. They accommodate large movements; a trough collects water under the joint.
Elastomer modules reinforced with steel plates, bolted to the anchorage beams. They accommodate movements through shear deformation of the elastomer.
OUR METHOD
Survey of the joint opening and movement range, condition of the edge beams, traffic phasing.
Saw-cutting the road surface, removing the old joint and breaking out the damaged anchorage concrete.
Reinforcing and casting the new edge beams in reinforced concrete or special mortar.
Setting the new joint flush with the road surface, with its opening preset to the deck temperature.
Connection to the waterproofing and road surface, checks, then reopening to traffic.
KEY POINTS
An expansion joint is only as good as its anchorage and installation. Every stage is checked before reopening to traffic.
ON SITE
WHY BBTP
BBTP specialises in maintaining and repairing bridges, including expansion joint replacement and rebuilding their anchorage zones.
Work in all 24 Tunisian governorates, notably for the Ministry of Equipment.
Crews trained by Mohamed Salah Biri, former head of SOMATRA’s structures department.
FAQ
Usually not: the work is phased one half of the carriageway at a time to keep traffic moving, following a phasing agreed with the owner.
It depends on the length of the joint, the type chosen and the traffic phasing. We set the schedule after surveying the structure.
Over time the sealing profile ages, tears or comes loose, and trapped debris damages it. Water then runs onto the bearings and pier caps and damages the concrete, so a leaking joint must be dealt with quickly.
Yes, when the damage is limited: replacing the sealing profile, retightening fixings or local repair of the anchorage concrete. When the joint is too worn or unsuitable, full replacement is the lasting solution.
Throughout Tunisia. BBTP works in all 24 governorates, notably for the Ministry of Equipment.
MORE EXPERTISE
A JOINT TO REPLACE?
Project owners, design offices, contractors: tell us about the structure and the defects observed, and we will get back to you.
Contact us