BBTP / PROJECTS
Our work, in pictures.
Work carried out for the Ministry of Equipment in several regions of Tunisia.
Repair and strengthening of the El Kantara Roman causeway bridge (Djerba)
For the Regional Directorate of Equipment of Medenine, BBTP is repairing and strengthening the bridge on regional road RR117, which links Zarzis to the island of Djerba along the El Kantara Roman causeway, between the Boughrara lagoon and the Mediterranean.
Rehabilitation of two road bridges over the railway in Sousse
As part of the national bridge rehabilitation programme, BBTP upgraded two road bridges over the railway in Sidi Abdelhamid (Sousse) for the Regional Directorate of Equipment of Sousse, in close collaboration with SNCFT.
- Client
- Regional Directorate of Equipment, Sousse
- In collaboration with
- SNCFT (Tunisian National Railways)
- Technical assistance
- CEP design office
- Location
- Sidi Abdelhamid, Sousse
Works carried out
- Deck jacking on temporary trestles, to unload the supports and repair them safely.
- Concrete repair: rebuilding of damaged bearing plinths, pier caps and piers.
- Resurfacing of the wearing course with asphalt concrete.
- Protective painting of the concrete faces.
- Installation of BN4 barriers.
Essential work for the safety of road users and of the rail traffic beneath the structures.










Repair and jacking of the Bizerte lift bridge
For the Regional Directorate of Equipment of Bizerte, BBTP carried out repair and jacking works on one of the country’s most iconic structures, in a marine setting above the channel.
- Client
- Regional Directorate of Equipment, Bizerte
- Structure
- Bizerte lift bridge
- Works
- Repair and jacking
- Location
- Bizerte
Works carried out
- Deck jacking, with safety packing on stacked steel plates.
- Repair of the damaged bearing areas under the deck.
- Works carried out from scaffolding fixed to the piers, above the water.
- On-site monitoring of the jacking, under the deck.
Work in a marine setting, on a structure in use in the heart of the city.







Repair of a bridge over the Medjerda river in Slouguia (Béja)
For the Regional Directorate of Equipment of Béja, BBTP repaired this road bridge over the Medjerda river: deck jacking, construction of plinths and installation of bearings, treatment of damaged concrete, beam repair and carbon fibre strengthening.
- Client
- Regional Directorate of Equipment, Béja
- Structure
- Bridge over the Medjerda river
- Works
- Repair, jacking and bearing installation
- Location
- Slouguia, Béja governorate
Works carried out
- Deck jacking to free and treat the bearing areas.
- The bridge was originally locked, with no bearings: plinths were built and bearings installed under the jacked deck, which has regained its freedom of movement.
- Removal of damaged concrete and treatment of corroded reinforcement.
- Repair and resurfacing of the deck beams.
- Beam strengthening with carbon fibre laminates and fabrics.
Targeted repairs to extend the life of a Medjerda crossing.

















Replacement of a pedestrian footbridge at Sousse railway station
BBTP replaced the old, cracked and deteriorated pedestrian footbridge at Sousse railway station with a new single-span structure of three precast girders on micropile foundations.
- Structure
- Pedestrian footbridge, 1 span, 3 girders
- Works
- Demolition and rebuilding
- Location
- Sousse railway station, city centre
- Acceptance
- Partial acceptance granted without reservations
Works carried out
- Removal and demolition of the old, cracked and deteriorated footbridge.
- Deep foundations on micropiles, then reinforced-concrete piers and columns.
- On-site precasting of the three reinforced-concrete girders by BBTP, lifting and placing with a mobile crane, then casting of the deck slab and access stairs.
- Placing of the edge cornices with a telescopic handler.
- Equipment and finishes: guardrails, anti-fall mesh, finishing screed and solar street lights.
A new structure replacing a cracked, deteriorated footbridge over the tracks at Sousse station.











Repair of a bridge over the Khmeyssia wadi in Zaghouan (RL636)
On this three-span girder bridge, BBTP replaced the carriageway and footway joints, strengthened the scoured foundations and rebuilt the approach embankments.
- Structure
- Girder bridge, 3 spans, 2 abutments and 2 piers
- Road
- Local road RL636, chainage 4+400
- Location
- Khmeyssia wadi, Zaghouan governorate
- Acceptance
- Partial acceptance on 8 December 2020, without reservations
Works carried out
- Replacement of the carriageway and footway expansion joints.
- Reinforced-concrete jacketing of the scoured footings and filling of the voids under the abutment caps by injecting self-compacting concrete (SCC).
- Construction of a retaining wall and rebuilding of the slope.
A complete restoration, from the deck equipment down to the foundations.








Rehabilitation of a masonry arch bridge in Bir Bouregba (Nabeul)
Restoration of the structure and its surroundings, with gabion and stone-pitching bank protection.
Expansion joint replacement
Removal of worn joints, rebuilding of anchorage zones and installation of new joints.
Bearing replacement and deck jacking
Jacking under traffic, on jacking blocks or temporary trestles.
Repair, surface treatment and maintenance
Work at height and in marine settings, by day and by night.
Additional post-tensioning
New anchorage blocks and deviators for the external post-tensioning.
Concrete jacketing and crack injection
Strengthening of vertical or horizontal structural members.
Click a photo to view it full size.