BBTP replaced the old, cracked and deteriorated pedestrian footbridge at Sousse railway station with a new single-span structure of three precast girders on micropile foundations.

Structure
Pedestrian footbridge, 1 span, 3 girders
Works
Demolition and rebuilding
Location
Sousse railway station, city centre
Acceptance
Partial acceptance granted without reservations

Works carried out

  • Removal and demolition of the old, cracked and deteriorated footbridge.
  • Deep foundations on micropiles, then reinforced-concrete piers and columns.
  • On-site precasting of the three reinforced-concrete girders by BBTP, lifting and placing with a mobile crane, then casting of the deck slab and access stairs.
  • Placing of the edge cornices with a telescopic handler.
  • Equipment and finishes: guardrails, anti-fall mesh, finishing screed and solar street lights.

A new structure replacing a cracked, deteriorated footbridge over the tracks at Sousse station.

TECHNIQUES USED

The expertise behind this project.

All our techniques ↗
01

Guardrails and restraint systems

Installation of guardrails and safety barriers, including BN4 barriers.

Learn more ↗
02

Structure maintenance

Assessment, repair and restoration of bridges, viaducts and culverts, across Tunisia.

Learn more ↗
03

Jacking and bearings

Lifting the deck with hydraulic jacks with safety lock nuts, with displacement monitoring by sensors, to replace or reseat the bearings.

Learn more ↗

A STRUCTURE TO REPAIR?

Let’s talk about your structure.

Project owners, design offices, contractors: tell us about the structure and the defects observed, and we will get back to you.

Contact us