Repair of a bridge over the Khmeyssia wadi in Zaghouan (RL636)

On this three-span girder bridge, BBTP replaced the carriageway and footway joints, strengthened the scoured foundations and rebuilt the approach embankments.

Structure
Girder bridge, 3 spans, 2 abutments and 2 piers
Road
Local road RL636, chainage 4+400
Location
Khmeyssia wadi, Zaghouan governorate
Acceptance
Partial acceptance on 8 December 2020, without reservations

Works carried out

  • Replacement of the carriageway and footway expansion joints.
  • Reinforced-concrete jacketing of the scoured footings and filling of the voids under the abutment caps by injecting self-compacting concrete (SCC).
  • Construction of a retaining wall and rebuilding of the slope.

A complete restoration, from the deck equipment down to the foundations.

TECHNIQUES USED

The expertise behind this project.

All our techniques ↗
01

Expansion joint replacement

Removal of worn joints, rebuilding of the reinforced-concrete anchorage zones and installation of new expansion joints.

Learn more ↗
02

Concrete jacketing and crack injection

Reinforced-concrete jacketing of vertical or horizontal structural members, and crack injection.

Learn more ↗
03

Concrete repair

Removal of damaged concrete, treatment of corroded reinforcement and rebuilding of the surfaces.

Learn more ↗