Jacking and bearings
Lifting the deck with hydraulic jacks with safety lock nuts, displacement monitoring by sensors, bearing replacement.
Learn more ↗BBTP / WORK IN PROGRESS
For the Regional Directorate of Equipment of Medenine, BBTP is repairing and strengthening the bridge on regional road RR117, which links Zarzis to the island of Djerba along the El Kantara Roman causeway, between the Boughrara lagoon and the Mediterranean.
A structure in a marine setting, between lagoon and sea, heavily exposed to salt and humidity.












TECHNIQUES USED
Lifting the deck with hydraulic jacks with safety lock nuts, displacement monitoring by sensors, bearing replacement.
Learn more ↗Removal of damaged concrete, treatment of corroded reinforcement and rebuilding of the surfaces.
Learn more ↗Bonded carbon fibre laminates and fabrics: a light strengthening that adds no weight to the structure.
Learn more ↗A STRUCTURE TO REPAIR?
Project owners, design offices, contractors: tell us about the structure and the defects observed, and we will get back to you.
Contact us