Jacking and bearings
Deck lifting with safety-nut jacks, displacement monitoring by sensors, bearing replacement.
Learn more ↗AFRICA / BRIDGES
Over time, bearings seize or get crushed, expansion joints wear out and concrete deteriorates. BBTP, a Tunisian bridge specialist since 2002, jacks bridge decks, including under traffic, replaces bearings and joints and repairs concrete. We study requests from all over Africa.
WARNING SIGNS
During an inspection, these defects mean the structure should be examined by a specialist:
WHAT WE DO
We work for public project owners as well as general contractors, as a specialist subcontractor.
Deck lifting with safety-nut jacks, displacement monitoring by sensors, bearing replacement.
Learn more ↗Removal of worn joints, rebuilding of the reinforced-concrete anchorage zones and installation of new joints.
Learn more ↗Removal of damaged concrete, treatment of corroded rebar and rebuilding of the surfaces.
Learn more ↗OUTSIDE TUNISIA
Photos of the defects, drawings, inspection report, location: send us what you have, by email or WhatsApp.
We review the file, then visit the structure to confirm the diagnosis and the method.
Method, resources, schedule and price, prepared according to the client’s specifications.
Our specialist teams and equipment on site, on our own or with a local contractor depending on the country, through to acceptance of the works.
IN AFRICA
Many of Africa’s bridges are several decades old and have never had their bearings or joints replaced. Maintaining them is a shared challenge for the continent’s road and rail networks.
In Algeria, a paper presented at the World Road Congress (Mexico City, 2011) counted more than 11,000 bridges, over 40% of which needed maintenance, repair or strengthening. Source: M. Abdessemed, S. Kenai, A. Bali, World Road Congress (PIARC), Mexico City, 2011
OUR REFERENCES
For the Ministry of Equipment, the Ministry of Transport, SNCFT and Tunisie Autoroutes, in all 24 Tunisian governorates.
FAQ
We lift the deck with hydraulic jacks fitted with safety lock nuts, monitoring movements with sensors, then replace or re-seat the bearings.
Not necessarily. We jack decks under traffic; restrictions may apply during the lifting phases, as agreed with the project owner.
Yes: removal of worn joints, rebuilding of the reinforced-concrete anchorage zones and installation of new joints.
Our completed projects are in Tunisia, for the Ministry of Equipment, the Ministry of Transport, SNCFT and Tunisie Autoroutes. We study requests from all over Africa.
Depending on the country and the project, we work on our own or with a local contractor, through to acceptance of the works.
A PROJECT IN AFRICA?
Send us your photos and the location on WhatsApp, or email us, and we will get back to you.