AFRICA / COASTAL

Spalling concrete and rebar corrosion in coastal cities: repair

On the coast, salt and humidity attack the reinforcement in concrete: the steel rusts, swells and makes the concrete spall. BBTP, a Tunisian concrete repair specialist since 2002, has repaired structures in marine environments and studies requests from all over Africa. Send us your photos on WhatsApp.

WARNING SIGNS

Warning signs

On balconies, facades, columns or bridges, these signs mean the structure should be examined by a professional.

  • Concrete spalling
  • Rust stains on the concrete
  • Exposed, swollen rebar
  • Cracks running along the rebar
  • Pieces of concrete falling

If cracks are getting worse quickly, pieces of concrete are falling or you hear cracking noises, move people away from the area, call the emergency services or the authorities, then bring in a control office.

WHAT WE DO

The techniques we use.

Patching the spalls is not enough: the damaged concrete must first be removed and the steel treated.

All our techniques ↗
01

Concrete repair

Removal of damaged concrete, treatment of corroded rebar and rebuilding of the surfaces.

Learn more ↗
02

Reinforced-concrete jacketing

A new reinforced-concrete shell around columns, beams or walls, and crack injection.

Learn more ↗
03

CFRP strengthening

Bonded laminates and fabrics, column wrapping: a light strengthening that does not thicken the members.

Learn more ↗

OUTSIDE TUNISIA

How does a project outside Tunisia work?

  1. Your request

    Photos of the defects, drawings, inspection report, location: send us what you have, by email or WhatsApp.

  2. Review and site visit

    We review the file, then visit the structure to confirm the diagnosis and the method.

  3. Proposal

    Method, resources, schedule and price, prepared according to the client’s specifications.

  4. Works

    Our specialist teams and equipment on site, on our own or with a local contractor depending on the country, through to acceptance of the works.

IN AFRICA

Where this problem arises in Africa

Africa’s coastal cities, from Algiers to Dakar, Abidjan to Lagos, Douala to Mombasa and Dar es Salaam to Maputo, share the sea air that attacks the reinforced concrete of buildings, hotels, ports and bridges.

OUR REFERENCES

Projects completed in Tunisia.

Structures in marine environments: the Bizerte lift bridge, above the canal, and the El Kantara Roman causeway bridge, between lagoon and sea, now being repaired.

All our projects ↗

FAQ

Coastal corrosion: your questions.

Why does concrete spall near the sea?

Salt and humidity in the sea air reach the reinforcement. As it rusts, the steel swells and breaks off the concrete covering it.

Is patching the spalls enough?

No. The damaged concrete must first be broken out and the corroded rebar treated, then the surfaces rebuilt with repair mortar and protected.

Do you work in marine environments?

Yes. We repaired the Bizerte lift bridge, in a marine environment, and we are repairing the El Kantara Roman causeway bridge in Djerba, between lagoon and sea.

What should we send you?

Photos of the defects, the location and, if possible, the drawings or the latest inspection report, by WhatsApp or email.

Have you already worked in our country?

Our completed projects are in Tunisia, for the Ministry of Equipment, the Ministry of Transport, SNCFT and Tunisie Autoroutes. We study requests from all over Africa.

A PROJECT IN AFRICA?

Let’s talk about your project.

Send us your photos and the location on WhatsApp, or email us, and we will get back to you.

mohamed.biri@bbtp.com.tn