Reinforced-concrete jacketing
A new reinforced-concrete shell around columns, beams or walls, and crack injection.
Learn more ↗AFRICA / BRIDGES
During a flood, the current digs out the ground around a bridge’s foundations: this is scour. The approach embankments erode and the footings are left exposed. BBTP, a Tunisian bridge specialist since 2002, has strengthened scoured foundations and studies requests from all over Africa.
WARNING SIGNS
After a flood, these signs mean the bridge should be inspected by a specialist:
If the bridge looks damaged, follow the authorities’ instructions and have it inspected by a professional; reopening it to traffic is for the authorities to decide.
WHAT WE DO
On the Khmeyssia wadi bridge, we strengthened the scoured foundations, jacketed the footings in reinforced concrete and rebuilt the approach embankments.
A new reinforced-concrete shell around columns, beams or walls, and crack injection.
Learn more ↗Removal of damaged concrete, treatment of corroded rebar and rebuilding of the surfaces.
Learn more ↗Diagnosis, repair and restoration of bridges, viaducts and culverts.
Learn more ↗OUTSIDE TUNISIA
Photos of the defects, drawings, inspection report, location: send us what you have, by email or WhatsApp.
We review the file, then visit the structure to confirm the diagnosis and the method.
Method, resources, schedule and price, prepared according to the client’s specifications.
Our specialist teams and equipment on site, on our own or with a local contractor depending on the country, through to acceptance of the works.
IN AFRICA
Wadis in the Maghreb, the great rivers of West and Central Africa, the rivers of East and Southern Africa: wherever floods are strong, bridge foundations must be monitored and, if needed, strengthened.
OUR REFERENCES
The Khmeyssia wadi bridge (Zaghouan): scoured foundations, jacketed footings, rebuilt embankments.
FAQ
It is the erosion of the ground around a bridge’s foundations by the current, especially during floods. The foundations can end up exposed.
Yes. On the Khmeyssia wadi bridge (Zaghouan), we strengthened the scoured foundations, jacketed the footings and rebuilt the approach embankments.
If the structure looks damaged, follow the authorities’ instructions, then have the bridge inspected by a professional; reopening it to traffic is for the authorities to decide.
Photos of the defects, the location and, if possible, the drawings or the latest inspection report, by WhatsApp or email.
Depending on the country and the project, we work on our own or with a local contractor, through to acceptance of the works.
A PROJECT IN AFRICA?
Send us your photos and the location on WhatsApp, or email us, and we will get back to you.